Case Studies » Helping This Train Station – Stay On Track
"The Finch Aggregates team were brilliant to work with. Everything we asked of them was delivered on time and to a high standard."
Project Manager
Finch Aggregates was proud to support the construction of a new train station project with several products and services over a 12-month period.
Our involvement began with the initial site muckaway from the virgin land area. This was to ensure that any waste or spoil was professionally and methodically removed from the site during earthwork operations. As with all the primary tasks on a build such as this, the highest levels of service delivery are demanded for muckaway to allow the rest of the project to develop on time, to budget and at the desired levels of high quality.
Finch Aggregates was also trusted with the supply of bulk 1A Fill material for the construction of the railway embankment. This worked in tandem with the continuous and sustained deliveries of both quarried MOT Type 1 Subbase and pipe bedding materials that we provided for the life of the work. Our provision of recycled road planings were key to the sustainability targets of the project being met in a responsible way too.
The results were fantastic and a great showcase for how Finch Aggregate’s one stop shop approach for all quarry products works in practice. Contact us now to learn more about how we can help your project get the best results possible.